PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Anchor bolt repair at c.l ----- (800x600).jpg Assembling the crane Facing South  (800x600).jpg Assembling the crane Facing South-East (800x600).jpg Constructing the slip forms at Elev. 7-Stair -4,5 Facing South (800x600).jpg Constructing the slip forms at Elev. 7-Stair -4,5 Facing South-East (800x600).jpg Steel Truck -1 at Cherry St. (800x600).jpg Steel Truck -2 (close up) at Cherry St. (800x600).jpg Steel Truck -2 at Cherry St. (800x600).jpg
Previous pageNext page Constructing the slip forms at Elev. 7-Stair -4,5 Facing South (800x600)
Constructing the slip forms at Elev. 7-Stair -4,5 Facing South (800x600)